EPA 608 · 40 CFR 82.157 · rolling 365-day window
Leak-Rate Workpaper
Determination
No determination yet.
Rolling leak rate
-
Window additions ÷ full charge
Threshold
-
Set by appliance category
Margin
-
Percentage points
Inspector stamp and dual sign-off are locked on the free draft.
Some top-offs fall outside the window
These rows are excluded from the rate. Select one to edit its date.
Threshold schedule
| Category | Threshold | This ledger |
|---|---|---|
| Comfort cooling | 10.0% | Held until complete |
| Commercial refrigeration | 20.0% | Held until complete |
| Industrial process | 30.0% | Held until complete |
Tolerance checks
- HOLDAwaiting entries
- HOLDWindow opens once the service date is valid
- HOLDLeak rate held until complete
- HOLDRepair clock held until complete
Top-off chronology
| # | Date | Added | Running |
|---|
Window opens once the service date is valid
Guidance
- Guidance appears once the record is complete.
Show the math
Waiting for complete entries.
- Window
- -
- Rows
- -
- Allowed in window
- -
Inspector sign-off
The free draft records the determination; Pro adds certified dual sign-off.
Supports recordkeeping; does not replace the regulation, agency guidance, or professional compliance advice.